Shall One Start Something Early, so It Has Not to Be Done at All?
We think so: To avoid the need for a special industrialization phase between prototypes and pilot series, we carry out Design for Cost, Design for Test, Design for Manufacturing, etc. right from the start.
In addition, we ensure from the outset that all certification requirements acc. CE or UL, etc. are taken into account, e.g. for EMC (ElectroMagnetic Compatibility), safety, RoHS (Reduction of Harmful Substances). This shortens your development time and reduces your expenditure. You are faster and more economical on the market.
The following measures, among others, help us to achieve this goal:
- The first prototype is already developed in such a way that it could be the series product and meets the certification requirements. This means that usually only one further correction, one other prototype, is required before series production, with a maximum of two corrections.
- In addition, we try to produce all prototypes on the production lines for the series, which means that process problems are detected early on.